Project overview:

Quarter Scale Testing of the Intelligent Mooring System for FOWT Platforms

Awardee:

PCCI, Inc.

Start Date:

Q3, 2021

Technical Challenge Area:

Floating Structure Engineering

Completion Date:

N/A (Currently Underway) 

Synopsis:

The objectives of the proposed work are to advance the IMS to TRL 6 through close collaboration with U.S. floating offshore wind platform developer Ocergy, and 1/4-scale IMS at-sea testing in the U.S by PCCI., while simultaneously establishing PCCI as the U.S. supplier for sales of the IMS.

Target Outcomes:

1
IMS Integration with the OCG-Wind Design – accomplished by merging the design and control features of the IMS with the pneumatic stability control system in the OCG-Wind platform.
2
IMS Product Design and Assessment – accomplished by ABS based on supplied design data and drawings.

NOWRDC Project Manager

JulianF-2765_Online-square
Program Manager

Project Principal Investigator

Hudon-Thomas
Principle Engineer

Share

Facebook
Twitter
LinkedIn
Facebook
Twitter
LinkedIn